Residual materials from the integrated steel plant itself or other sources often contain valuable compounds of e.g. C and Fe. Dust and sludge have to be agglomerated to be able to recycle to the blast furnace (BF) via top-charging. By injection of the materials, preparation methods in terms of e.g. drying and/or screening only, can be used. Alternative carbon materials (ACM) in terms of BF dust and sludge have been successfully injected up to levels of 60 kg/tHM in the LKAB Experimental Blast Furnace (LKAB EBF®). Efficiency in recovery of valuable compounds as well as the behavior of undesired elements have been evaluated and are discussed.