Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
The cost of decoupled planning: Co-optimising transmission, batteries and hydrogen under demand-side participation in a European power system
RISE Research Institutes of Sweden, Safety and Transport, Measurement Technology. Institute for Research in Technology (IIT), Comillas Pontifical University, Alberto Aguilera 23, Madrid, 28015, Spain.ORCID iD: 0000-0003-3862-9747
Institute for Research in Technology (IIT), Comillas Pontifical University, Alberto Aguilera 23, Madrid, 28015, Spain.
Institute for Research in Technology (IIT), Comillas Pontifical University, Alberto Aguilera 23, Madrid, 28015, Spain.
2026 (English)In: Sustainable Energy, Grids and Networks, E-ISSN 2352-4677, Vol. 48Article in journal (Refereed) Published
Abstract [en]

High shares of renewable energy sources require transmission expansion planning (TEP) to account for flexibility resources that substitute for lines. This paper quantifies the cost of planning those resources separately from the network. National and cross-border transmission, battery energy storage systems (BESS) and hydrogen (H2) subsystems are co-optimised across 15 pathways and 12 scenarios on an 84-node European network, with demand-side management (DSM) at three participation levels and a fixed generation fleet. Storage and transmission substitute for one another in 45 of 48 paired comparisons, and in every one where national lines can be built: BESS reduce annualised network investment by a median of 3.5–7.8% and grid capacity needs by up to 12.4%, and hydrogen by at most 1.3%. The transmission scope reverses the curtailment effect of hydrogen: the H2 turbine reduces curtailment in all 24 comparisons restricted to cross-border lines and increases it in 22 of 24 comparisons that admit national lines. Physical and economic criteria rank storage technologies in opposite orders. Pathways without BESS require 5.4 times more grid capacity per unit of storage, whereas hydrogen returns 62–73% against 13–17% for BESS, excluding avoided scarcity costs; on the same basis, cross-border lines return 31% and national lines 56%. Planning storage and transmission separately costs 0.18–1.67% of annual system cost. DSM improves adequacy and defers capital without lowering operating cost: investment falls by 5.8–10.7% while the cost of building and operating the system rises by 1.2–4.6%. National reinforcement, not cross-border lines, serves all demand; without it, 5–24 TWh/year are unserved

Place, publisher, year, edition, pages
Elsevier BV , 2026. Vol. 48
Keywords [en]
Demand-side management, Energy storage systems, Flexibility resources, Hydrogen subsystems, Storage co-optimisation, Transmission expansion planning
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:ri:diva-82999DOI: 10.1016/j.segan.2026.102550Scopus ID: 2-s2.0-105053338403OAI: oai:DiVA.org:ri-82999DiVA, id: diva2:2111708
Note

QC 20261020

Available from: 2026-10-20 Created: 2026-10-20 Last updated: 2026-10-20Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Alvarez, Erik

Search in DiVA

By author/editor
Alvarez, Erik
By organisation
Measurement Technology
In the same journal
Sustainable Energy, Grids and Networks
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 12 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf