This pre-study investigated the possibility of replacing all or parts of the concrete structural frame in a standardized barracks building (typkasern) developed by the Swedish Fortifications Agency (Fortifikationsverket) with prefabricated timber elements. The study was carried out by RISE in collaboration with Derome and Södra and was based on the technical requirements, floor plans, and structural design conditions specified by the Swedish Fortifications Agency. The results show that it is possible to construct a standardized barracks building with a predominantly timber-based hybrid structural system that meets all functional and durability requirements placed on the building. The solution offers several advantages, including shorter construction time, fewer transports, lower climate impact, and the possibility of using locally sourced raw materials throughout Sweden. The proposed solution consists of load-bearing timber-framed walls, cross-laminated timber (CLT) walls, and CLT floor slabs in combination with a limited number of concrete and steel components in areas where specific requirements make timber less suitable. Once the concrete elements are in place, the timber structure can be assembled, and the building is estimated to reach a weather-tight condition within approximately 12 to 23 days, depending on production rates and the number of work shifts. At the same time, the study identified that the Swedish Fortifications Agency’s current standardized barracks designs are optimized for concrete structural systems, which limits the opportunities to fully utilize the advantages of timber construction. The results indicate that further efficiencies could be achieved if future standardized barracks are designed with the requirements and characteristics of timber structural systems as a starting point from an early stage. Overall, timber-based standardized barracks are considered a technically feasible and promising approach for meeting the requirements placed on standardized barracks.
QC 20260908