Endre søk
Begrens søket
1 - 27 of 27
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Treff pr side
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
Merk
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 1.
    Carlson, Eva-Sara
    et al.
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Kumm, Mia
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Dederich, Anne
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Zakirov, Artur
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Upphöjda gångbanor i spårtunnlar2017Rapport (Annet vitenskapelig)
    Abstract [sv]

    I tunnlar för spårbunden trafik har allt fler upphöjda gångbanor projekterats de senaste åren. Dessa gångbanor är belägna lägst i jämnhöjd med överkanten på rälsen och som högst i jämnhöjd med tågets utgångar, med en sträckning längs med spårtunneln, och är avsedda att användas vid utrymning. Upphöjda gångbanor har framhållits som en personsäkerhetshöjande åtgärd, men dess egentliga påverkan på säkerhetsnivån är baserade på mycket begränsade erfarenheter och osäkert beräkningsunderlag.

    Syftet med utfört utrymningsförsök har varit att studera människors beteende och förflyttning vid utrymning på upphöjda gångbanor.

    Det övergripande projektmålet har varit att utveckla förslag till riktlinjer (beslutsunderlag) angående hur olika faktorer som påverkar utrymningsförloppet på upphöjda gångbanor ska hanteras vid brandteknisk projektering. Målet med de utförda försöken som presenteras i denna rapport var att generera ett kvantitativt och kvalitativt resultat, som stöd och underlag till dessa riktlinjer.

    Arbetet har begränsats till att behandla flöde av personer, nyttjande av gångbanebredden, människors förutsättningar att passera långsamgående samt möjlighet till utrymning för rullstolsburna. Rapporten har dessutom kompletterats med observationer som gjorts då insamlat videomaterial bearbetats i samband med analysen.

    Utrymningsförsöket genomfördes på Skarpnäcks tunnelbanestation, Stockholm. Då stationen inte har några befintliga upphöjda gångbanor byggdes en gångbana med hjälp av skärmväggar intill perrongkanten. Totalt 111 försökspersoner deltog, varav tre var rullstolsburna.

    Försöket var indelat i fem delförsök. I delförsök 1, 3 och 5 förflyttade sig hela försöksgruppen från ena änden av gångbanan till den andra. Bredden varierades mellan 1,20 m, 1,05 m respektive 0,90 m. I delförsök 2 och 4 delades försöksgruppen upp i två delar. Hälften förflyttade sig, likt tidigare delförsök, längs med gångbanan och hälften startade i det tåg som fanns parkerat intill gångbanan och anslöt sedan till flödet på gångbanan. Bredden varierades mellan 1,20 m respektive 1,05 m. Referensförsök utfördes i en korridor, som också den byggdes upp med skärmväggar på perrongen. När del- och referensförsöken var avslutade ombads försökspersonerna att delta i en enkätstudie, vilket de flesta valde att göra.

    Resultaten från försöket visar att personflödet sjönk med minskad bredd på gångbanan. Detta gällde för samtliga punkter där flödet mättes, inklusive flödet ut ur tåget. I resultaten framgår också att gångbanans bredd nyttjades i större utsträckning på den del av gångbanan där ett tåg stod parkerat intill gångbanan än på den del där det var öppet ut mot spårområdet.

    I enkätundersökningen framgår att nästan hälften av försökspersonerna upplevde att det var problem att passera långsamgående personer. Vissa passerade, men med svårigheter, och andra ville passera, men fick inte möjlighet till det.

    En av de tre rullstolsburna som deltog i försöket upplevde obehag orsakat av gångbanans höjd och bredd, vilket resulterade i att personen endast deltog i delförsök 1 och 2.

    Fulltekst (pdf)
    fulltext
  • 2.
    Carlson, Eva-Sara
    et al.
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety. Lund University, Sweden.
    Kumm, Mia
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety. Mälardalen University, Sweden.
    Zakirov, Artur
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety. KTH Royal Institute of Technology, Sweden.
    Dederichs, Anne
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety. DTU Technical University of Denmark, Sweden.
    Evacuation tests with elevated platforms in railway tunnels2019Inngår i: Fire safety journal, ISSN 0379-7112, E-ISSN 1873-7226, Vol. 108, artikkel-id 102840Artikkel i tidsskrift (Fagfellevurdert)
    Abstract [en]

    With the purpose to increase the knowledge on human behaviour when evacuating along elevated platforms, an experiment was carried out at the subway station of Skarpnäck, Stockholm, in October 2016. The overall project objective was to develop basic data for guidelines regarding fire safety design concerning evacuation along elevated platforms. The experiment was designed as a group experiment divided into five different scenarios. In total, 111 persons of mixed gender and age participated. The results from the experiment show that the flow rate along the elevated platform decreased as the walkway was getting narrower. It could also be seen that along the first half of the walkway, where a train was located on the rail track next to the elevated platform, the flow rate was higher and the width of the walkway was used to a lager extent compared to the second half of the walkway where the platform was open to the track area. One of three wheelchair users who participated in the experiment expressed discomfort caused by the height and the width of the walkway and nearly half of the participants experienced problems with passing others walking slower than themselves.

  • 3.
    Claesson, Alexander
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Lindström, Johan
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Li, Ying Zhen
    Kumm, Mia
    Laboratory fire experiments with a 1/3 train carriage mockup2012Rapport (Fagfellevurdert)
    Fulltekst (pdf)
    FULLTEXT01
  • 4.
    Huang, Chen
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Svensson, Robert
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Kumm, Mia
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Open Source CFD programvara för brandmodellering2015Inngår i: Brandposten, nr 53, s. 34-35Artikkel i tidsskrift (Annet (populærvitenskap, debatt, mm))
  • 5.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Kumm, Mia
    Kan mobila fläktar användas för brandgasevakuering i tunnlar2005Inngår i: Teknik och forskning, s. 56-58Artikkel i tidsskrift (Annet (populærvitenskap, debatt, mm))
  • 6.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Kumm, Mia
    Nilsson, D
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Claesson, Alexander
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Li, Ying Zhen
    Fridolf, Karl
    Åkerstedt, Rolf
    Nyman, Hans
    Dittmer, Torkel
    Forsén, Rickard
    Janzon, Bo
    Meyer, G
    Bryntse, A
    Carlberg, Tobias
    Newlove, Lindy
    Palm, Anders
    The METRO Project - Final Report2012Rapport (Fagfellevurdert)
  • 7.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Frantzich, Håkan
    Kumm, Mia
    Brandsäkerhet i tunnlar under byggtiden2009Inngår i: Bygg & Teknik, nr 6, s. 52-54Artikkel i tidsskrift (Annet (populærvitenskap, debatt, mm))
  • 8.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Frantzich, Håkan
    Kumm, Mia
    Fire incidents during construction work of tunnels2010Rapport (Fagfellevurdert)
    Fulltekst (pdf)
    FULLTEXT01
  • 9.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Kumm, Mia
    Fullskaliga försök gav intressanta resultat om brandutbeckling i pendeltåg och tunnelbana2012Inngår i: Bygg & Teknik, nr 6, s. 54-Artikkel i tidsskrift (Annet (populærvitenskap, debatt, mm))
  • 10.
    Ingason, Haukur
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Vylund, Lotta
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Kumm, Mia
    Fridolf, Karl
    Frantzich, Håkan
    Palm, Anders
    Palmkvist, Krister
    Taktik och Metodik vid brand i Undermarksanläggningar (TMU) - sammanfattningsrapport2015Rapport (Fagfellevurdert)
    Fulltekst (pdf)
    FULLTEXT01
  • 11.
    Kumm, Mia
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Ny teknik kan ge säkrare räddningsinsatser2015Inngår i: Brandposten, nr 52, s. 8-9Artikkel i tidsskrift (Annet vitenskapelig)
  • 12. Kumm, Mia
    et al.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Unika försök ger säkrare tunnelbana2011Inngår i: Brandsäkert, nr 7, s. 28-30Artikkel i tidsskrift (Annet vitenskapelig)
  • 13.
    Kumm, Mia
    et al.
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Storm, Artur
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Ingason, Haukur
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Hådell, Per
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Räddningsinsatser med och utan säker tillgång till släckvatten i spårtunnlar2022Rapport (Annet vitenskapelig)
    Abstract [sv]

    Rapporten avses att utgöra ett stöd för planering och riskbedömning inför och vid räddningsinsatser i spårtunnlar. Rapporten sammanfattar tidigare forskning och kunskap avseende branddynamik i tunnlar, räddningstjänstens förflyttning vid insats, brandsläckning i fordon samt insatshöjande åtgärder i form av såväl bärbar teknik och utrustning som permanenta installationer i tunneln.

    Räddningsinsatser i tunnlar har traditionellt innefattat samtidig slanguppbyggnad, baserat på tolkningen av arbetsmiljöföreskrifterna för rökdykning (AFS 2007:7) samt förfarandet vid rökdykarinsatser vid brand i byggnad. Förhållandena vid bränder i byggnader och vid bränder i tunnlar skiljer väsentligt. I en byggnad är tillgången till säker vattenförsörjning en förutsättning för rökdykarens säkerhet. I en tunnel, där ytskikten är obrännbara, brandgaserna inte ansamlas i ett begränsat utrymme och berget kyler brandgaserna längre bort från branden, är inte alltid tillgången till säker vattenförsörjning det som bäst tillgodoser säkerheten för räddningstjänstens personal när arbetsmoment som inte innefattar släckning genomförs. Detta innebär inte att kraven på säkerhet ska sänkas, utan att andra åtgärder som bibehåller eller höjer säkerhetsnivån behöver vidtas. Sådana åtgärder kan vara utökad användning av värmekamera, utökad övervakning av luftförsörjningen, tekniska installationer som stödjer orientering och vägledning samt utrustning, exempelvis spårbundna räddningstrallor, som medför snabbare förflyttning och minskad luftförbrukning.

    I rapporten föreslås en indelning i fyra zoner, som direkt kopplar till de branddynamiska förhållanden som råder i respektive zon. Förenklat innebär zonindelningen följande:

    • Kall zon – Ingen risk för rökfyllnad. Ingen risk för värmepåverkan från branden.
    • Sval zon – Viss risk för rökfyllnad. Ingen risk för värmepåverkan från branden.
    • Varm zon – Delvis eller helt rökfylld tunnel, men liten risk för värmepåverkan från branden.
    • Het zon – Direkt påverkan från branden. Brand eller risk för brand.

    Till respektive zon kopplas sedan relevanta skyddsnivåer och det arbete som bedöms kunna genomföras beskrivs. I varm zon bedöms arbete kunna genomföras utan tillgång till säkert vatten, utom i de fall syftet med arbetet är att bygga upp vattenförsörjning för senare arbete i het zon. I het zon ska alltid säker tillgång till vattenförsörjning finnas.

    En viktig del av en säker insats i tunnlar, med eller utan säkert vatten, är den kunskap som både den enskilde rökdykaren och de befäl som beslutar om operativa eller strategiska åtgärder behöver besitta. Rapporten ger därför både en vetenskaplig grund för beslut och pekar på indikatorer som kräver övervakning i syfte att säkerställa rökdykarnas arbetsmiljö.

    Fulltekst (pdf)
    fulltext
  • 14.
    Kumm, Mia
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Sundström, Björn
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, material (BRm).
    Ökat samarbete med Ungern2015Inngår i: Brandposten, nr 52, s. 14-Artikkel i tidsskrift (Annet vitenskapelig)
  • 15.
    Kumm, Mia
    et al.
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Williams Portal, Natalie
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Johansson, Richard
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Förstudie – Provningsmetod fysisk säkerhet för säkerhetskänslig verksamhet2024Rapport (Annet vitenskapelig)
    Abstract [sv]

    Rapporten redovisar resultaten från en förstudie som har genomförts under 2023 inom ramen för CFORT Centrum för fortifikatorisk kompetens. CFORT är en kompetensplattform med syfte att bygga upp och upprätthålla nationell fortifikatorisk kompetens för hela totalförsvarets behov. CFORT drivs i samverkan mellan Fortifikationsverket, RISE Research Institutes of Sweden och Försvarsmakten och där 15 myndigheter finns representerade i plattformens referensgrupp. Förstudien bygger på de resultatet från REINFORCE-projektet, som drivits inom CFORT och i huvudsak finansierats av EU:s fond för inre säkerhet ISF. Inom förstudien har befintliga standarder för fysisk säkerhet studerats och utvärderats med avseende på motståndsförmåga mot mer kvalificerade angrepp. Förstudiens slutsats är att en ny sammanhållen standard för fysisk säkerhet som tar höjd för hoten mot säkerhetskänslig verksamhet bör utformas och upprättas. Rapporten beskriver också övergripande hur en sådan standard och provmetod skulle kunna vara uppbyggd samt vilka utmaningar och möjligheter ett sådant arbete står inför. Slutligen ger rapporten vägledning till och förslag på det fortsatta arbetet.

    Fulltekst (pdf)
    fulltext
  • 16.
    Kumm, Mia
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Wirström, Niklas
    RISE., Swedish ICT, SICS.
    Nilsson, Martin
    RISE., Swedish ICT, SICS, Computer Systems Laboratory.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Vylund, Lotta
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Safety positioning for first responders to fires in underground constructions: A pre-study of demands and possibilities2016Rapport (Annet vitenskapelig)
    Abstract [en]

    This report presents the results of the SafePos pre-study, in which different technologies for safety positioning to be used by first responders were identified, and techniques for ad hoc positioning were evaluated. The aim of the project, was to test various systems for localisation and communication and narrow- and wide-band radio transmission techniques, and to further investigate how the presence of such a system could support fire and rescue operations in complex underground environments. Tests have been carried out in real, pre-existing mining environments, and complex office corridors with similar conditions to those of a mine as regards curves and obstructions have been used for introductory tests. A computer application for digital simulation has been developed and adapted to the system, although this only operates on a relatively basic level, so as to support the testing of the positioning and communication systems; thus, more can be done to improve performance for real-life applications. The analysis was conducted by studying the results of the experiments and linking them to expected usage during a fire and rescue operation. Tests have also been carried out in cooperation with the fire and rescue services in order to identify equipment and wearable technologies that could support and make fire and rescue operations in mines and other complex underground constructions safer and more efficient. In order to transfer information to and from these wearable technologies and to improve the likelihood of a safe and efficient fire and rescue operation, positioning and connectivity are requirements.Keywords: Underground constructions, mine, fire safety, positioning, connectivity

    Fulltekst (pdf)
    fulltext
  • 17.
    Lönnermark, Anders
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Claesson, Alexander
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Lindström, Johan
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Li, Ying Zhen
    Kumm, Mia
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Full-scale fire tests with a commuter train in a tunnel2012Rapport (Fagfellevurdert)
    Fulltekst (pdf)
    FULLTEXT01
  • 18.
    Lönnermark, Anders
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Claesson, Alexander
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Lindström, Johan
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Li, Ying Zhen
    Kumm, Mia
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Gas composition during a fire in a train carriage2014Inngår i: Proceedings of Sixth International Symposium on Tunnel Safety and Security., SP Sveriges Tekniska Forskningsinstitut , 2014, , s. 165-174Konferansepaper (Annet vitenskapelig)
  • 19.
    Lönnermark, Anders
    et al.
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Ingason, Haukur
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Li, Ying Zhen
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Kumm, Mia
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Fire development in a 1/3 train carriage mock-up2017Inngår i: Fire safety journal, ISSN 0379-7112, E-ISSN 1873-7226, Vol. 91, s. 432-440Artikkel i tidsskrift (Fagfellevurdert)
    Abstract [en]

    To study what parameters that control the initial fire spread and the development to local flashover in a metro carriage, a total of six fire tests were conducted in a mock-up of a metro carriage that is about 1/3 of a full wagon length. They were carried out under a large scale calorimeter in a laboratory environment. The focus was on the initial fire development in a corner scenario using different types of ignition source that may lead to a fully developed fire. The ignition sources used were either a wood crib placed on a corner seat or one litre of petrol poured on the corner seat and the neighbouring floor together with a backpack. The amount of luggage and wood cribs in the neighbourhood of the ignition source was continuously increased in order to identify the limits for flashover in the test-setup. The tests showed that the combustible boards on parts of the walls had a significant effect on the fire spread. In the cases where the initial fire did not exceed a range of 400–600 kW no flashover was observed. If the initial fire grew up to 700–900 kW a flashover was observed. The maximum heat release rate during a short flashover period for this test set-up was about 3.5 MW. The time to reach flashover was highly dependent on the ignition type: wood cribs or backpack and petrol. A full developed carriage fire was achieved as a result of intense radiation from the flames and ceiling smoke layer. This was mostly dependent on the amount of fire load nearby the ignition source and how strong the vertical flame spread on the high pressure laminate boards mounted to walls and ceiling above the ignition source was, leading to a ceiling flame. In such cases, the seats alone did not contain sufficient fuel for the fire to spread within the train, and additional fuel (luggage) is required near the seats. For fully developed carriage fires, the fire starting on the seat in the corner spread to the opposite seat on the same side of the aisle, then horizontally spread to seats on the other side of the aisle, and finally a longitudinal flame spread along the carriage was observed. When and where the fire stopped or whether it reached a fully developed stage was mostly dependent on the amount of fire load nearby the ignition source and how strong the vertical flame spread on the high pressure laminate boards mounted to walls and ceiling above the ignition source was.

  • 20.
    Lönnermark, Anders
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Lindström, Johan
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Li, Ying Zhen
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Kumm, Mia
    Large-scale Commuter Train Fire Tests - Results from the METRO Project2010Inngår i: Proceedings from 5th International Symposium on Tunnel Safety and Security, SP , 2010, , s. 447-456Konferansepaper (Annet vitenskapelig)
  • 21.
    Lönnermark, Anders
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut. Mälardalen University, Sweden.
    Vylund, Lotta
    RISE., SP – Sveriges Tekniska Forskningsinstitut.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut. Lund University, Sweden.
    Palm, Anders
    Storstockholms Brandförsvar, Sweden.
    Palmkvist, Krister
    Södra Älvsborgs Räddningstjänstförbund, Sweden.
    Kumm, Mia
    RISE., SP – Sveriges Tekniska Forskningsinstitut. Mälardalen University, Sweden.
    Frantzich, Håkan
    Lund University, Sweden.
    Fridolf, Karl
    RISE., SP – Sveriges Tekniska Forskningsinstitut. Lund University, Sweden.
    Recommendations for Firefighting in Underground Facilities2016Inngår i: Proceedings from the 7th International Symposium on Tunnel Safety and Security, 2016, s. 115-125Konferansepaper (Annet vitenskapelig)
    Abstract [en]

    The need for a successful fire and rescue operation in an underground facility, e.g., a tunnel, introduces challenges both in the planning phase and during the incident. This is because these types of facilities can be very complex, and thus, specific tactics are needed compared to the more common incidents, e.g. in residential premises. When planning a fire and rescue operation and developing the tactics many different aspects need to be considered: complexity of the facility, the expected number of people involved in the operation, information available about the incident, the purpose of operation, etc. This paper contains recommendations for firefighting in underground facilities. The recommendations are structured in accordance to the sequential time period during which some specific fire safety design measures are taken. These periods are the design phase, the construction phase and finally when the facility is in operation. The recommendations presented in this paper are based on the results of the Swedish TMU research project (Tactics and methodologies for firefighting in underground facilities), results from other research projects and experience from real fire and rescue operations.

  • 22.
    Lönnermark, Anders
    et al.
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Vylund, Lotta
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research, Branddynamik.
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Fire Research.
    Palm, Anders
    Palmkvist, Krister
    Kumm, Mia
    Frantzich, Håkan
    Fridolf, Karl
    Rekommendationer för räddningsinsatser i undermarksanläggningar2015Rapport (Fagfellevurdert)
    Fulltekst (pdf)
    FULLTEXT01
  • 23. Meyer, G
    et al.
    Berglund, R
    Lönnermark, Anders
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Kumm, Mia
    Full-Scale Commuter Train Explosion Test2012Rapport (Fagfellevurdert)
  • 24. Palm, Anders
    et al.
    Kumm, Mia
    Ingason, Haukur
    RISE., SP – Sveriges Tekniska Forskningsinstitut, SP Sveriges tekniska forskningsinstitut, SP – Sveriges Tekniska Forskningsinstitut / Brandteknik, skydd (BRs ).
    Full-scale tests of alternative methods for fire fighting in underground structures2014Inngår i: Proceedings of Sixth International Symposium on Tunnel Safety and Security., SP Sveriges Tekniska Forskningsinstitut , 2014, , s. 573-582Konferansepaper (Annet vitenskapelig)
  • 25.
    Palm, Anders
    et al.
    Greater Stockholm Fire Brigade, Sweden; Mälardalen University, Sweden.
    Kumm, Mia
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet. Mälardalen University, Sweden.
    Storm, Artur
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet. Luleå University of Technology, Sweden.
    Lönnermark, Anders
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Breathing air consumption during different firefighting methods in underground mining environment2022Inngår i: Fire safety journal, ISSN 0379-7112, E-ISSN 1873-7226, Vol. 133, artikkel-id 103661Artikkel i tidsskrift (Fagfellevurdert)
    Abstract [en]

    The paper analyses the breathing air consumption among participating firefighters during full-scale tests performed in the Tistbrottet mine in Sweden 2013. The availability of breathing air during firefighting has in earlier work been identified as a critical tactical factor in underground firefighting. Results from the tests show that there are differences in the breathing air consumption and that this depends on the methods used, equipment and the workload. The use of BA-teams, i.e. firefighters equipped with breathing apparatuses, is a complex group activity where the largest breathing air consumer will set the limits for the whole team. Light equipment and a structured command and control during the activities will enhance the endurance and the firefighting performance. Equipment and methods affect both firefighting performance and the durability of the firefighting activities. Examples of tested methods and equipment during the test series are: different variations of conventional hose lay-out; CAFS; cutting extinguisher; and trolley for equipment and complementary air. The aid of additional air supply and the use of trolleys will support the activities but is dependent on a large degree of preparation and training to function properly. Based on the tests, it is concluded that the larger model of air bottles should be considered for distances longer than 75 m. © 2022 The Authors

  • 26.
    Storm, Artur
    et al.
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Kumm, Mia
    RISE Research Institutes of Sweden, Säkerhet och transport, Brand och Säkerhet.
    Räddningsinsats i långa spårtunnlar2023Rapport (Annet vitenskapelig)
    Abstract [sv]

    Räddningsinsatser i undermarksanläggningar kan vara komplexa och kräva såväl kunskap som stora resurser. Spårtunnlar är dock generellt sett lättare att orientera sig i då tågtrafiken kräver relativt raka tunnlar utan stora lutningar. Om tunneln inte försetts med brännbar kondensisolering gör bergets eller betongens ytskikt och egenskaper att risken för övertändning är försumbar utom exempelvis inuti ett fordon eller i slutna teknikutrymmen. Detta gör att behovet av släckvatten för självskydd längre bort från branden är liten och att behovet av snabb och effektiv förflyttning vid rekognosering och avsökning motiverar förflyttning utan samtidig slanguppbyggnad.

    Inom Ostlänken-projektet har ett insatskoncept tagits fram, där huvudsaklig förflyttning sker i en brandtekniskt avskild servicetunnel och förflyttning från närliggande tvärtunnlar till en plats på säkert avstånd från branden sker i det drabbade tunnelröret. Förflyttningen från tvärtunneln mot branden föreslås ske utan samtidig slanguppbyggnad i de fall detta kan ske utan risk för den enskilda rökdykaren. Insatskonceptet för Ostlänken bygger också på att räddningstjänsten ska kunna dra nytta av de tekniska installationer som projekterats som stöd för utrymning, exempelvis belysning i handledare ovan gångbana.

    Projektet har genomförts i syfte att studera förflyttnings- och avsökningshastigheter i spårtunnelmiljö utan samtidig slangdragning, samt för assisterad förflyttning med bår eller med spårgående räddningstralla.  Målsättningen var att påbörja insamlandet av ett vetenskapligt underlag som kan användas i verifieringen av insatskoncept liknande Ostlänken och vid andra tillfällen när bedömning av räddningstjänstens förmåga eller metoder behöver genomföras.

    Rökdykarnas hastighet vid avsökning var snabbare än vad som visats i andra försök med samtidig slanguppbyggnad. Avsökningshastigheten var ca 0,5–0,6 m/s gående på gångbana och ca 0,6–2,0 m/s när avsökningen skedde från räddningstrallan. Ljusförhållandena var dock betydligt bättre än under tidigare försök i och med den kontinuerliga belysningen på handledaren. När avsökningen skedde från trallan var det endast det rökdykarpar som hade den lägsta förflyttningshastigheten som lyckades hitta den nödställde på gångbanan bakom tåget.

    Tillgången till värmekamera angavs i all utvärdering som en förutsättning för säker förflyttning i den rökfyllda miljön. Användandet av dubbla värmekameror skapade en trygghet i att båda rökdykarna enskilt kunde avsöka och orientera sig i tunneln. En skarp rekommendation som stöds av detta, samt tidigare genomförda, försök är att samtliga rökdykare som rör sig i den rökfyllda tunnelmiljön förses med egen värmekamera.

    Även om samtliga medverkande rökdykare i enkäter och vid de gemensamma genomgångarna uppgav att de kände sig trygga att genomföra förflyttning och insats utan samtidig slanguppbyggnad, fanns ett mindre antal rökdykare som angav att de vid en skarp insats gärna sett tillgång till säkert vatten, trots att de inte kunde redogöra för vilken nytta de skulle ha av brandslangen i liknande miljöer längre bort från branden. Detta visar på ett behov av ytterligare utbildning, övning och utveckling för att räddningstjänstens personal ska känna sig trygga med att genomföra insatser längre bort från brandplatsen utan tillgång till säkert vatten.

    Fulltekst (pdf)
    fulltext
  • 27.
    Zhao, Shengzhong
    et al.
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety. Chongqing University, China.
    Li, Ying Zhen
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Kumm, Mia
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Ingason, Haukur
    RISE - Research Institutes of Sweden, Säkerhet och transport, Safety.
    Liu, Fang
    Chongqing University, China.
    Re-direction of smoke flow in inclined tunnel fires2019Inngår i: Tunnelling and Underground Space Technology, ISSN 0886-7798, E-ISSN 1878-4364, Vol. 86, s. 113-127Artikkel i tidsskrift (Fagfellevurdert)
    Abstract [en]

    The re-direction of smoke flow in inclined tunnel fires refers to the phenomenon that the smoke flow direction suddenly changes due to the changes of thermal buoyancy or outside pressure or the activation of fans. This poses special risk for fire rescue services fighting fires in tunnels. Both small-scale tunnel fire tests (28 scenarios) and numerical simulations of full-scale tunnel fires (31 scenarios) were conducted to study this special phenomenon. A one-dimensional model was used to predict the flow velocity in the inclined tunnels, based on two different methods for calculating the mean smoke temperature (Method I and Method II, respectively). Results show that the smoke flow direction could be well predicted by the model with Method II. When the ventilation velocity is relatively large and the flow tends to be one dimensional, both methods produce similar results. Further, the influences of important factors on the re-direction of smoke flows were systematically analyzed. These factors include heat release rate, tunnel slope, tunnel length, friction factor, tunnel cross sectional area and fire source location.

1 - 27 of 27
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
v. 2.43.0