Plant-wide model-based analysis of iron dosage strategies for chemical phosphorus removal in wastewater treatment systemsShow others and affiliations
2019 (English)In: Water Research, ISSN 0043-1354, E-ISSN 1879-2448, Vol. 155, p. 12-25Article in journal (Refereed) Published
Abstract [en]
Stringent phosphorus discharge standards (i.e. 0.15–0.3 g P.m −3 ) in the Baltic area will compel wastewater treatment practice to augment enhanced biological phosphorus removal (EBPR) with chemical precipitation using metal salts. This study examines control of iron chemical dosing for phosphorus removal under dynamic loading conditions to optimize operational aspects of a membrane biological reactor (MBR) pilot plant. An upgraded version of the Benchmark Simulation Model No. 2 (BSM2) with an improved physico-chemical framework (PCF) is used to develop a plant-wide model for the pilot plant. The PCF consists of an equilibrium approach describing ion speciation and pairing, kinetic minerals precipitation (such as hydrous ferric oxides (HFO) and FePO 4 ) as well as adsorption and co-precipitation. Model performance is assessed against data sets from the pilot plant, evaluating the capability to describe water and sludge lines across the treatment process under steady-state operation. Simulated phosphorus differed as little as 5–10% (relative) from measured phosphorus, indicating that the model was representative of reality. The study also shows that environmental factors such as pH, as well operating conditions such as Fe/P molar ratios (1, 1.5 and 2), influence the concentration of dissolved phosphate in the effluent. The time constant of simultaneous precipitation in the calibrated model, due to a step change decrease/increase in FeSO 4 dosage, was found to be roughly 5 days, indicating a slow dynamic response due to a multi-step process involving dissolution, oxidation, precipitation, aging, adsorption and co-precipitation. The persistence effect of accumulated iron-precipitates (HFO particulates) in the activated sludge seemed important for phosphorus removal, and therefore solids retention time plays a crucial role according to the model. The aerobic tank was deemed to be the most suitable dosing location for FeSO 4 addition, due to high dissolved oxygen levels and good mixing conditions. Finally, dynamic model-based analyses show the benefits of using automatic control when dosing chemicals. © 2019 Elsevier Ltd
Place, publisher, year, edition, pages
2019. Vol. 155, p. 12-25
Keywords [en]
Chemical precipitation, Iron, Membrane bioreactors, Phosphorus removal, Plant-wide model, Wastewater treatment
National Category
Natural Sciences
Identifiers
URN: urn:nbn:se:ri:diva-38142DOI: 10.1016/j.watres.2019.01.048Scopus ID: 2-s2.0-85062073407OAI: oai:DiVA.org:ri-38142DiVA, id: diva2:1293864
2019-03-052019-03-052019-07-05Bibliographically approved