Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Optimisation of a centralised recycling system for steel plant by-products, a logistics perspective
RISE, Swerea, Swerea MEFOS AB.
RISE, Swerea, Swerea MEFOS AB.
Luleå University of Technology.
2013 (engelsk)Inngår i: Resources, Conservation and Recycling, ISSN 0921-3449, E-ISSN 1879-0658, Vol. 77, s. 29-36Artikkel i tidsskrift (Fagfellevurdert)
Abstract [en]

This paper focuses on the optimisation of a recovery strategy for waste materials and thereby improved material efficiency in the iron and steel industry. A joint venture between four Nordic steel plants is considered in order to recycle materials otherwise mainly put to landfill, i.e. dusts and sludges from the steel production processes. Process integration (PI) was used to investigate the possibilities for recovering the materials by developing a system optimisation model of the steel plants and integrating a dedicated material upgrading process in the system. This work aims to develop a model suitable for analysing and finding a logistic solution needed to achieve a common recycling system by studying material supply, required material storage, shipping system and shipping frequency. The developed optimisation model is presented, using a case study of the steel production plants with the dedicated upgrading process and the logistics system. The prospect for shipping materials from the steel production sites to the material upgrading process site as well as the material supply to the upgrading unit is essential in the system analysis. A mathematical optimisation model based on mixed-integer linear programming (MILP) for the common system is presented. The integration of the dedicated material upgrading process show a system in balance regarding the materials generated and processed in the upgrading unit. Generated material amounts suitable for the upgrading process can be fully recovered thereby decreasing the landfilled amounts from the four steel production sites. © 2013 Elsevier B.V. All rights reserved.

sted, utgiver, år, opplag, sider
2013. Vol. 77, s. 29-36
Emneord [en]
Dust and sludge recovery, Logistic perspective, Material efficiency, Process integration, Simulation and optimization, Steel production
HSV kategori
Identifikatorer
URN: urn:nbn:se:ri:diva-12666DOI: 10.1016/j.resconrec.2013.04.012Scopus ID: 2-s2.0-84879093305OAI: oai:DiVA.org:ri-12666DiVA, id: diva2:972858
Tilgjengelig fra: 2016-09-22 Laget: 2016-09-22 Sist oppdatert: 2017-11-21bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopushttp://www.sciencedirect.com/science/article/pii/S0921344913001006
Av organisasjonen
I samme tidsskrift
Resources, Conservation and Recycling

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 12 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
v. 2.35.8