Driftstörningar
Just nu har vi driftstörningar på sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Impact of unit load size on in-plant materials supply efficiency
Saab Automobile, Sweden; Chalmers University of Technology, Sweden.
Chalmers University of Technology, Sweden.ORCID-id: 0000-0002-3168-9889
2011 (Engelska)Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

The unit loads, e.g. plastic containers or EUR-pallets, used in an assembly plant can have a significant impact on time efficiency, and hence cost, of both the materials supply and the receiving assembly stations. Smaller unit loads can reduce the time the assemblers spend fetching parts. However, larger unit loads result in fewer moves for a given volume of materials, which implies efficient in-plant materials supply. The current paper explores how the time efficiency of in-plant materials supply is affected by the size of unit loads. Based on the case study, it is clear that the efficiency of the in-plant materials supply is not proportional to the size of the unit loads. There are fundamental differences between how large pallets, compared to smaller unit loads, are delivered, meaning that the increased delivery frequency required for smaller unit loads does not necessarily result in an increased man hour consumption.

Ort, förlag, år, upplaga, sidor
Fraunhofer-Verlag , 2011.
Nyckelord [en]
Pallets; Plastic containers; Supply chains, Assembly plants; Delivery frequency; Materials flow; Materials supplies; Milk-run deliveries; Plant material; Time efficiencies; Unit load size, Efficiency
Nationell ämneskategori
Maskinteknik
Identifikatorer
URN: urn:nbn:se:ri:diva-71722Scopus ID: 2-s2.0-84923422439OAI: oai:DiVA.org:ri-71722DiVA, id: diva2:1836206
Konferens
21st International Conference on Production Research: Innovation in Product and Production, ICPR 2011. Stuttgart. 31 July 2011 through 4 August 2011.
Tillgänglig från: 2024-02-08 Skapad: 2024-02-08 Senast uppdaterad: 2024-02-08Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Scopus

Person

Finnsgård, Christian

Sök vidare i DiVA

Av författaren/redaktören
Finnsgård, Christian
Maskinteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 7 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf